Skip to content

The Power Plant Gallery – Refresh

Location
Toronto, Ontario

Client
Harbourfront Centre / The Power Plant Gallery

Completion
2011

Size
13,200 ft² / 1,226 m²

Project Type
Culture, Interiors, Museum / Gallery

KPMB Team
Bruce Kuwabara (partner-in-charge), Taewook Eum (project architect), Jacki Chapel

Consultants
Boszko and Verity (Construction manager: Orest Boszko), Servocraft Limited (Mechanical), Blackwell Bowick Partnership LTD. (Structural), Hahn Studio & Monnet Design (graphic identity and signage)

Photography
Tom Arban