The Power Plant Gallery – Refresh
Location
Toronto, Ontario
Client
Harbourfront Centre / The Power Plant Gallery
Completion
2011
Size
13,200 ft² / 1,226 m²
Project Type
Culture, Interiors, Museum / Gallery
KPMB Team
Bruce Kuwabara (partner-in-charge), Taewook Eum (project architect), Jacki Chapel
Consultants
Boszko and Verity (Construction manager: Orest Boszko), Servocraft Limited (Mechanical), Blackwell Bowick Partnership LTD. (Structural), Hahn Studio & Monnet Design (graphic identity and signage)
Photography
Tom Arban